© Michigan Video and Photography
Project
LINEAGE LOGISTICS PHASE I » Sioux Falls, SD
A modern cold storage warehouse with blast freezing, export services, and rail service. Ti Cold was brought in to lead the design of the warehouse layout, docks and freezing areas to ensure that everything flowed smoothly. Gil Haugen, the General Contractor for the project, utilized Ti Colds know-how in building the vapor-tight envelope, refrigeration and freezing equipment.
Project Details
Facility Size
205,000 sq. ft.
Pallet Positions
30,000
Project Timeline
10 Months
COOL Features
- Export Services
- Blast Freezing With The QF+
- Rail Services With BNSF